I ordered the black and white toile wallpaper today for my powder room. Remember, I got my inspiration from the picture below. The wallpaper will probably arrive this Friday. But I am thinking that it won't be installed until after we move into the house. We have so many NECESSARY things to complete first.
So many things are going to be happening soon at our new home. It is hard trying to juggle all of the contractors. Today the hardwood floor is going to have the final sanding and buffing.
Here is what the rest of the schedule looks like. We are cutting it close!
October 1st - Phone Turned On
October 2nd - New appliances delivered and installed.
October 3rd and 4th - Painting contractor is painting the 2 story living room and both stairways.
(I don't have a ladder tall enough to paint those spaces)
October 5-7 - Carpet is being installed in all of the bedrooms and upstairs hallway
October 12 - Movers come and pick up and deliver our furniture.
In the middle of all of this, I am still painting. I have the baseboards, doors and windows to paint crisp white in two more bedrooms, before the carpet gets installed.
Then I have to paint my studio (including the floor - more on that later).
Things I still have to do that can wait until we move:
Paint living room
Paint dining room
Paint kitchen
Install tile back splash in kitchen
Install tile back splash in the laundry room
Tile the fireplace with the travertine tile and build the mantel
We are not sure if the master bath will be done before we move. But we have another bathroom that we can use, so that is not a priority.
I have to remember to BREATHE too. :-) Thanks for hanging in there with me!
Welcome Home,
Penny